The first photovoltaic charging station (solar charging station) in Holguin province, built by the small company Frenas Conmigo. It has completed its civil construction phase and is ready to begin operations with 32 kilowatts (kW) of inverters and 60 kW of batteries.
Álvaro Grass González, sole partner and founder of the company, exclusively informed the Cuban News Agency that the work carried out in this first phase. At the facility located in the Alcides Pino neighborhood of the provincial capital. Included preparing the building and installing of the solar panels.
After completing the technological connection, the center will provide charging services for electric tricycles, bicycle taxis, and motorcycles. An accessible alternative for transporters in the area in line with the country’s energy matrix transition policies, he explained.
Amid the complex energy situation facing the nation. The solar charging station will offer free services to the community. Including cell phone charging, rechargeable lamps, and cooking facilities. With designated areas within the premises, he noted.
Grass González specified that the facility will operate 24 hours a day. And will include a store specializing in high-demand electrical supplies. That are scarce in the informal market, such as switches, cables, electrical tape, and outlets.
Founded in 2022, the company holds the status of National Vanguard Collective. Awarded by the Cuban Workers’ Federation in recognition of its provincial leadership in the repair of brake and clutch systems. Which contributes to the sustainability of the vehicle fleet.
With information from CNA
- Iran Denounces Recent US Attacks as Violation of International Law - 10 de June de 2026
- Civil Phase Completed for Holguin’s First Solar Charging Station - 10 de June de 2026
- Etecsa’s Digital Tool Boosts Connectivity and Business Management in Holguin - 10 de June de 2026